Flood Protection FAQs | Flood Barrier Pros
Get answers to common questions about flood barriers, installation, and protection in Florida.
Frequently Asked Questions
Our technician measures all openings, slab slopes, and substrate conditions using laser levels and moisture meters. Data feed directly into CAD design files.
Average 45–90 minutes depending on property size. Results and preliminary drawings delivered within 24 hours.
Width, height, sill elevation, substrate compressive strength, and flood elevation (BFE) for FEMA documentation.
Yes, engineers flag non-reinforced masonry or deteriorated sills for repair before install.
Recommended for access and to review placement options and finishes.
CAD drawings, quote, and engineering summary referencing FEMA TB-3 and ASCE 24. Linked resources: installation guide and Modular Flood Barrier.